By Alex Reschka · Published November 11, 2026 · Last Updated: November 2026 · 7 min read
The difference is the number of contracts. In design-build you sign one, with a team responsible for both the drawings and the construction. In the traditional route, called design-bid-build, you sign two: one with an architect to design the house, then one with a builder who bid on the finished plans. Neither is wrong. They put the risk in different places.
This guide is written by Reschka Design Build, a design-build firm in Oakland County that also builds alongside outside architects. It covers how each route works, where the cost surprises come from, and how to tell which one fits your project.
How Design-Bid-Build Works
Design-bid-build runs in sequence. You hire an architect, who develops the design and produces construction drawings. Those drawings go out to builders for bids. You pick a builder and sign a second contract for construction.
Its strengths are real. The design is developed independently, and you get competing prices on one fixed set of drawings. If you already hold complete, permit-ready documents, this is the route built for you.
Its weak spot is timing. The price arrives after the design is finished. If the bids come back over your number, the choices are to redesign, cut scope, or find more money, and the drawings you paid for may need to be redone.
How Design-Build Works
Design-build overlaps the steps. The builder joins while the design is still moving. Each structural or material decision is priced against current trade rates while it can still change, so the estimate develops alongside the drawings.
The planning work happens in a paid preconstruction phase covering design coordination, engineering, selections, permitting, and real trade pricing. It ends with completed plans and a fixed construction price. Construction starts only when scope, selections, and price are settled.
Side by Side
| Design-build | Architect, then builder (design-bid-build) | |
|---|---|---|
| Contracts you sign | One | Two |
| When you learn the real price | During design, fixed before construction | After design, when bids come back |
| Builder's role in design | At the table from the first working session | None until bidding |
| When a drawing and a field condition disagree | One team owns the answer | Owner mediates between two contracts |
| Sequence | Design, pricing, and procurement overlap | Design, then bid, then build |
| Fits best | Remodels, additions, and custom homes where design and budget must move together | Owners with complete documents who want competitive bids on a fixed scope |
Where the Cost Surprise Comes From
When design and construction pricing happen separately, cost feedback arrives too late. That's a property of the sequence, not a failing of the people in it. An architect designing without a builder at the table has no live trade pricing to design against. The first hard number shows up at bid time.
Remodels and additions make the gap wider. Existing conditions drive cost: what the foundation can carry, where the load paths run, what's inside the walls. The builder is the one who reads those conditions. In design-build that reading happens in preconstruction, with a structural engineer, before the design is fixed.
You Can Keep Your Architect
Design-build doesn't mean giving up the architect you trust. Reschka Design Build works two ways. Some clients want a single-source team and use our in-house design. Others arrive with an architect already engaged.
In that second case the architect stays in the lead on design. We join from the first working session and bring constructability and pricing as the design develops. One contract still covers construction, so there's one point of accountability once work begins. More on both paths in our guide to custom home design in Oakland County.
When Design-Bid-Build Is the Better Choice
- You already hold complete, permit-ready construction documents.
- You want competing bids on that fixed scope and are comfortable managing two contracts.
- The project is simple enough that a late price won't force a redesign.
When Design-Build Is the Better Choice
- You're remodeling or adding on, and the existing house will shape the cost.
- You're building a custom home on a specific lot and want site, design, and budget resolved together.
- You want the price known before construction, and you'd rather decide early, on paper, than in the field.
- You don't want to be the one mediating between a designer and a builder.
For a cosmetic refresh or a single-room update, neither route is necessary. A contractor working directly is simpler.
Questions to Ask Either Way
- When will I know what this costs to build, and what is that number based on?
- Who is responsible when the drawings and the existing house disagree?
- Who prices a change, and is it approved in writing before the work proceeds?
- If I bring my own architect, at what point does the builder join?
The answers show where the coordination sits. With two contracts, more of it lands on the owner. With one, it sits with the firm. If you're leaning toward design-build, our guide on how to choose a design-build firm covers what to check next.
What This Looks Like in Oakland County
Much of the housing in Birmingham and the Bloomfields dates from the 1950s through the 1970s. A second-story addition on one of those homes needs foundation capacity analysis and new load paths before a floor plan means anything. Many Bloomfield Hills subdivisions require architectural review before the city permit. Lake lots in West Bloomfield carry shoreline permits and setbacks.
Each of those is a construction question that changes the design. Answering them during design, instead of after bids, is the practical case for design-build here.
How Reschka Design Build Runs It
We run every project in four phases: Discovery, Preconstruction, Construction, and Handoff. Discovery is a conversation and a site walk at no cost. Preconstruction is a paid agreement, typically 3–8% of estimated construction value, that ends with completed plans and a fixed construction price. You aren't obligated to proceed.
Custom homes start at $700K, typically $250–$400+ per square foot. Whole-home remodels and additions start at $200K. We work in seven Oakland County communities and take 12 projects a year. If you're deciding between the two routes, tell us about the project and we'll give you a straight answer on which one fits.
Frequently Asked Questions
Is design-build the same as design-bid-build?
No. Design-build puts design and construction under one contract with one accountable team. Design-bid-build separates them: an architect completes the design, the drawings go out to bid, and a builder is hired under a second contract. The main practical difference is when you learn the real price.
Can I hire my own architect and still use design-build?
Yes. Reschka Design Build works alongside the architect a client has already chosen. The architect leads the design, the builder joins from the first working session with constructability and pricing input, and a single contract covers construction.
Is design-build more expensive than hiring an architect and a builder separately?
Design-build is typically comparable or lower in total project cost. The savings come from avoiding redesign when bids land over budget and from pricing decisions while they can still change. Preconstruction is a paid phase, and it is where that pricing work gets done.
What is a preconstruction agreement?
A paid contract covering design, engineering, and planning. At Reschka Design Build it typically runs 3–8% of estimated construction value. You end with completed plans, a fixed construction price, and a construction contract, and you are not obligated to proceed.
Who is responsible if the drawings and the house don't match?
In design-build, one team. Design coordination, preconstruction, and construction sit under one contract, so there is no question about who owns the answer. With separate design and construction contracts, the owner often ends up mediating between the two.